Badakhshan: Construction of a 10 km road in Yaftal Bala district reaches 97% progress

Anonymous (not verified)
شنبه ۱۴۰۰/۴/۱۲ - ۱۰:۴۱
Badakhshan: Construction of a 10 km road in Yaftal Bala district reaches 97% progress

The 10.54-kilometer-long gravel road starts from the Samchan Valley to the village of Langar in the Yaftal Bala district of Badakhshan province, which is currently 97 percent complete, will be operational in the near future.

The project has been contracted between the Ministry of Public Works and seven local development councils and was funded by the Government of Afghanistan.

During the construction of this road, more job opportunities have been provided for the residents of the entire region; and with the completion of this project, the transportation problems of Narvand, Samchan, and Chakulach O Pishthik villages will be solved.

MoPW Media Team-Kabul

2 years ago

.

تازه ترین اخبار

چهارشنبه ۱۴۰۴/۳/۱۴ - ۸:۵۳
Background image

نشست هماهنگی درمورد تائيدی مسیرهای تعیین شده ای خط آهن بلخ – هرات و هرات - کندهار برگزار گردید

 نشست هماهنگی درمورد تائيدی مسیرهای تعین شده ای خط آهن بلخ – هرات و هرات – کندهار تحت ریاست محترم الحاج محمد عیسی ثانی سرپرست وزارت فوایدعامه ا.ا.ا با اشتراک معینان محترم ۹ وزارتخانه و. . .

دوشنبه ۱۴۰۴/۳/۱۲ - ۱۴:۲۴
Background image

در ماه ثور از طریق خطوط آهن (۳۳۲۸۳۷) متریک تُن انتقالات صورت گرفته است

از آغاز تا ختم ماه ثور سال ۱۴۰۴هـ.ش. از طریق خطوط آهن وزارت فواید عامه افغانستان (۳۳۲۸۳۷) متریک تُن انتقالات صورت گرفته است.

در این میان از طریق بندر حیرتان (۲۴۷۰۴۲) تُن، بندر آقینه. . .

دوشنبه ۱۴۰۴/۳/۱۲ - ۱۴:۱۶
Background image

سی‌وپنجمین اجلاس مجمع منطقه‌ای راه‌آهن کشورهای خاورمیانه در ایران برگزار شد

 

 سی‌وپنجمین اجلاس مجمع منطقه‌ای راه‌آهن کشورهای خاورمیانه (UIC RAME) با حضور مقامات ارشد کشورهای عضو و نمایندگان اتحادیه بین‌المللی راه‌آهن‌ها به میزبانی جمهوری اسلامی ایران برگزار. . .

BACK TO NEWS